Question Bank of objective type questions by Railway Board for filling up of the posts of SSO(A/cs), Sr.TIA & Sr.ISA
QUESTION BANK PREPARED BY RAILWAY BOARD
Question Bank of objective type questions in Appendix III A IREM Examination for filling up of the posts of SSO(A/cs), Sr.TIA & Sr.ISA.
CHAPTER 1
Question bank Goods Section
| Sr.No | Draft Question | Answer |
| 1. | What is EOL at Goods Sheds/Sidings | C |
|
Options |
A. Electricity of Line | |
| B. Efficiency of Line | ||
| C. Engine On Load | ||
| D. Efficiency of Load | ||
| 2. | Which of the following do not work on EOL basis | B |
|
Options |
A. Government Sidings | |
| B. Private/Assisted sidings | ||
| C. National Sidings | ||
| D. International Sidings | ||
| 3. | Free time for Demurrage/Wharfage calculation depends upon | A |
|
Options |
A. Type of Wagon | |
| B. Height of Waon | ||
| C. Load of Wagon | ||
| D . Width of Wagon | ||
| 4. | Demurrage charges are calculated on | D |
|
Options |
A. Only on particular wagon which is delayed | |
| B. Only for particular party whose wagon is delayed | ||
| C. Wagons having same commodity as that of delayed wagon | ||
| D. Entire group (Rake) of Wagons | ||
| 5. | Free time for Loading/Unloading of BCNHL wagons in mini rake is | B |
|
Options |
A. 3 hours | |
| B. 5 hours | ||
| C . 6 hours | ||
| D 9 hours | ||
| 6. | Free time for double operation of container commodity handled by sling cranes | A |
|
Options |
A .8 hours | |
| B .6 hours | ||
| C.5 hours | ||
| D.10 hours | ||
| 7. | Free time for calculation of Demurrage/Wharfage charges is equally applicable to | C |
|
Options |
A. Only for BG wagons | |
| B .Only for MG wagons | ||
| C.BG as well as MG wagons | ||
| D.None of the above | ||
| 8. | Permissible free time for loading of rakes of coal and/or iron-ore can be reduced to 3 hours by | B |
|
Options |
A. PCOM in consultation with PCEE | |
| B. PCCM in consultation with PCOM | ||
| C. PCOM in consultation with PFA | ||
| D . None of the above | ||
| 9. | How many days prior notice needs to be given to terminals before reducing free time for loading rakes of Coal and/or iron-ore | D |
|
Options |
A. Three Months | |
| B. Two Months | ||
| C. Five Weeks | ||
| D. Two weeks | ||
| 10. | Demurrage is charged on | C |
|
Options |
A. Excess loading of wagons | |
| B. Excess attachment of wagons | ||
| C. Excess detention of rake | ||
| D. None of the above | ||
| 11. | Formula for calculation of demurrage charges is | A |
|
Options |
A. (Time of release – Time of placement) – Free Time | |
| B. (Time of placement – Time of release) – Free Time | ||
| C. Time of release – Time of placement | ||
| D None of the above | ||
| 12. | The time lapsed between completion of 1st part of the rake and placement of 2nd part of the rake is termed as | B |
|
Options |
A. Extra time | |
| B. Dies-Non | ||
| C. Application Time | ||
| D. Rest time | ||
| 13. | Select the correct option for calculation of demurrage | D |
|
Options |
A. Total hours are to be divided by dies-non for calculating demurrage | |
| B. Dies-Non cannot affect demurrage charges | ||
| C. Dies-Non is to be multiplied with total hours for calculating demurrage | ||
| D. Dies-Non is to be deducted from total hours for calculating demurrage | ||
| 14. | Grant of free time and levy of demurrage on a rake is linked with | C |
|
Options |
A. No of staff deployed on siding | |
| B. Area of siding | ||
| C. Handling capacity of the sidings | ||
| D. None of the above | ||
| 15. | Separate free time is applicable for | B |
|
Options |
A. Rice commodity | |
| B. Seven old steel plants | ||
| C. Fruits commodity | ||
| D. None of the above | ||
| 16. | Terminal allowance for pull through trains is allowed for | B |
| Options | A. 1 hour | |
| B. 45 minutes | ||
| C. 1 hour 30 minutes | ||
| D. 5 hours | ||
| 17. | In case of unfit/sick wagon, additional free time, beyond permissible free time is | A |
|
Options |
A. 24 hours | |
| B. 10 hours | ||
| C. 30 hours | ||
| D. No free time allowed | ||
| 18. | Adjustment under Debit-Credit system is done on | D |
|
Options |
A. Weekly basis | |
| B. Quarterly basis | ||
| C . Bi-Monthly basis | ||
| D. Monthly basis | ||
| 19. | Penal demurrage charges are levied for | C |
|
Options |
A. Maximum of ten times of the prevalent rate | |
| B. Maximum of four times of the prevalent rate | ||
| C. Maximum of six times of the prevalent rate | ||
| D. Maximum of twelve times of the prevalent rate | ||
| 20. | For calculating Night incentive under Demurrage/Wharfage, timings for night is considered from | B |
|
Options |
A. 24.00 hrs to 8.00 hrs | |
| B. 22.00 hrs to 6.00 hrs | ||
| C. 24.00 hrs to 6.00 hrs | ||
| D. 21.00 hrs to 6.00 hrs | ||
Read further: View/Download Question Bank