Opening of 06 new NVS Regional Office – Notification dated 10.09.2024
Navodaya Vidyalaya Samiti
Ministry of Education
(Dept. of School Education & Literacy)
Government of India
B-15, Institutional Area, Sector-62
Noida – 201307 (Uttar Pradesh)
F. No. 29-312022-NVS(GA)/689
Dated: 10.09.2024
NOTIFICATION
Govt. of India, Ministry of Education, Department of School Education & Literacy vide letter No. 17-21/2022-UT-3 dated 29 08 2024 has approved opening of 06 new Regional Offices (RO) of Navodaya Vidyalaya Samiti (NVS) at Ahmedabad, Bengaluru, Bhubaneshwar, Gurugram, Guwahati & Ranchi. The permanent campus of these 06 new ROs will be as per the details given below:
S.No. | Name of new RO | Location | Complete Address |
1 | Ahmedabad | Campus of JNV, Gandhinagar | JNV Sametri, Post – Sametri, Block / Tahsil – Dehgam, Distt. Gandhinagar, Gujarat, PIN – 382315 |
2 | Bengaluru | Campus of JNV, Bengaluru (Urban) | JNV, Bagalur, Post – Bagalur, Block / Tahsil – Bangalore North, Distt Bangalore Urban, Karnataka, PIN – 562149 |
3 | Bhubaneshwar | Campus of JNV, Khordha |
JNV, Gurujanga, Post – Gurujanga, Block / Tahsil – Khordha, Distt. Khordha, Odisha, PIN – 752057 |
4 | Gurugram | Campus of JNV, Gurugram | JNV Mohammadpur, Post – Farrukhnagar, Block / Tahsil – Farrukhnagar, Distt Gurugram, Haryana, PIN – 122506 |
5 | Guwahati | Campus of JNV, Kamrup | JNV, Hariandab, Post – Jamtola, Block / Tahsil – Rangta, Distt. Kamrup, Assam, PIN – 781365 |
6 | Ranchi | Campus of JNV. Ranchi | JNV Mesra. Post – Mesra. Block Tahsil – Kanke, Distt. Ranchi, Jharkhand, PIN – 835217 |
[adinserter name=”p1″]
2. Accordingly, the JNVs have been redistributed among 08 existing & 06 new ROs and the modified jurisdiction of the existing & new ROs is enclosed as Annexure. However, this jurisdiction is subject to change, on sanctioning of new JNVs or due to administrative requirements.
3. Further, the JNVs wilf continue to be managed / controlled by the 08 existing ROs as per the existing arrangement till the new ROs are operationalized. The re-distribution of States / JNVs among existing & new ROs will be made effective only after the operationalization of new ROs. Further developments in this connection will be communicated separately.
[Sameer Pandey]
Joint Commissioner (Admin.)
COMMENTS