HomeCadre Restructuring

Opening of 06 new NVS Regional Office – Notification

Opening of 06 new NVS Regional Office – Notification dated 10.09.2024

Navodaya Vidyalaya Samiti
Ministry of Education
(Dept. of School Education & Literacy)
Government of India
B-15, Institutional Area, Sector-62
Noida – 201307 (Uttar Pradesh)

F. No. 29-312022-NVS(GA)/689

Dated: 10.09.2024

NOTIFICATION

Govt. of India, Ministry of Education, Department of School Education & Literacy vide letter No. 17-21/2022-UT-3 dated 29 08 2024 has approved opening of 06 new Regional Offices (RO) of Navodaya Vidyalaya Samiti (NVS) at Ahmedabad, Bengaluru, Bhubaneshwar, Gurugram, Guwahati & Ranchi. The permanent campus of these 06 new ROs will be as per the details given below:

S.No. Name of new RO Location Complete Address
1 Ahmedabad Campus of JNV, Gandhinagar JNV Sametri, Post – Sametri, Block / Tahsil – Dehgam, Distt. Gandhinagar, Gujarat, PIN – 382315
2 Bengaluru Campus of JNV, Bengaluru (Urban) JNV, Bagalur, Post – Bagalur, Block / Tahsil – Bangalore North, Distt Bangalore Urban, Karnataka, PIN – 562149
3 Bhubaneshwar Campus of JNV,
Khordha
JNV, Gurujanga, Post – Gurujanga, Block / Tahsil – Khordha, Distt. Khordha, Odisha, PIN – 752057
4 Gurugram Campus of JNV, Gurugram JNV Mohammadpur, Post – Farrukhnagar, Block / Tahsil – Farrukhnagar, Distt Gurugram, Haryana, PIN – 122506
5 Guwahati Campus of JNV, Kamrup JNV, Hariandab, Post – Jamtola, Block / Tahsil – Rangta, Distt. Kamrup, Assam, PIN – 781365
6 Ranchi Campus of JNV. Ranchi JNV Mesra. Post – Mesra. Block  Tahsil – Kanke, Distt. Ranchi, Jharkhand, PIN – 835217

[adinserter name=”p1″]

2. Accordingly, the JNVs have been redistributed among 08 existing & 06 new ROs and the modified jurisdiction of the existing & new ROs is enclosed as Annexure. However, this jurisdiction is subject to change, on sanctioning of new JNVs or due to administrative requirements.

3. Further, the JNVs wilf continue to be managed / controlled by the 08 existing ROs as per the existing arrangement till the new ROs are operationalized. The re-distribution of States / JNVs among existing & new ROs will be made effective only after the operationalization of new ROs. Further developments in this connection will be communicated separately.

[Sameer Pandey]
Joint Commissioner (Admin.)

View/Download the PDF

COMMENTS

WORDPRESS: 0